Transfer department oversight
A chief engineer handover transfers oversight of the engineering department. Focus on machinery availability, maintenance priorities, outstanding defects, resources, and reporting commitments. Detailed equipment readings belong in the supporting system records, rather than obscuring the decisions the incoming chief needs to make.
Chief engineer review priorities
- Summarise main engine and generator availability, operating restrictions, unresolved alarms, and the machinery needing attention first. Link each limitation to the vessel’s current defect record.
- Review running hours and overdue planned maintenance for critical machinery. Identify the job number, reason for deferral, assigned engineer, and agreed next action in the planned maintenance system.
- Identify unresolved defects, temporary arrangements, responsible engineers, and required follow-up or escalation.
- Review pending parts and service attendance, purchasing status, supplier contacts, and resource constraints.
- Locate the engine log, service reports, relevant class or survey correspondence, and outstanding requests from the technical superintendent. Record each open commitment with its due date and owner.
- Reconcile the bunker and lubricating-oil figures being handed over against the vessel’s records, noting the measurement time and any unresolved discrepancy. Confirm engineering duties and the incoming chief’s first review priorities.
Connect the summary to technical records
Prepare a department summary with links to the detailed machinery records.
Discuss priorities and unresolved decisions with the incoming chief engineer.
Record which commitments remain open and who owns each next action.
Keep decisions and ownership visible
Weak handover
The engineers know the outstanding jobs.
Useful handover
Illustrative example; not a customer vessel record.
Generator No. 2: cooling-water seepage remains open under defect D-014. The second engineer owns the follow-up; the service quotation is attached as D-014A. The incoming chief must confirm the attendance date with the technical superintendent. Current operating restrictions are recorded in the vessel’s defect register; this handover does not authorise a change to them.
Bring the records that explain the department’s priorities
Start with the machinery limitations and commitments the incoming chief must understand before allocating work. Link the summary to the defect register, planned maintenance system, service reports, and relevant correspondence. A long list of jobs does not explain why one job was deferred or which decision is waiting for shore support.
- For a maintenance deferral, identify the PMS reference, reason recorded, responsible engineer, and next review date.
- For pending service attendance, identify the supplier, quotation or order reference, contact, and date still awaiting confirmation.
- For surveys or management requests, record the correspondence reference, due date, and person responsible for the response.
- For fuel or lubricant figures, record the source, measurement time, and any discrepancy that still needs reconciliation.
Finish with the first decisions and remaining questions
Ask the incoming chief to identify the first matters requiring review: an unresolved operating limitation, an overdue critical job, a parts decision, or a reporting commitment. Record the owner of every unanswered question and where the supporting information can be found.
Keep machinery operation and approval decisions within the vessel’s procedures. A handover records existing instructions and restrictions; it does not authorise a temporary arrangement or certify that machinery is safe to operate.
About this guidance
Prepared by PassLog editorial. The examples are fictional and the checklists must be adapted to the vessel and company procedures. Use the vessel’s approved procedures for operations, familiarisation, and watchkeeping.
Send corrections or questions about this guide to [email protected]. For the international safety-management framework, see the IMO overview of the ISM Code. It provides context for company procedures; it does not endorse this checklist.
Related articles
- Chief Engineer Handover Notes: Two Open-Job Examples
Prepare the department summary around machinery limitations, maintenance priorities, pending parts and services, and decisions awaiting the incoming chief.
- Engine Room Handover: Seven System Groups to Review
Use seven system groups as an organising aid, then adapt the scope to the vessel, assigned duties, equipment list, and company procedures.
Create the handover record in PassLog
Add voice notes, photos, written notes, and documents. PassLog generates your handover. Review the details with the incoming crew, then sign the PDF.